Yemen Condemns the Twin Bombings Targeting Damascus
The Ministry of Foreign Affairs and Expatriates expressed its strong condemnation and denunciation of the twin bombings that targeted the Syrian capital, Damascus, resulting in injuries to a number of civilians and security personnel.
Bahrain Says Air Defenses Intercepted and Destroyed Several “Treacherous” Iranian Air Attacks
The General Command of the Bahrain Defence Force announced on Thursday that Iran continues what it described as a systematic hostile approach through missile and drone attacks targeting civilians in the Kingdom of Bahrain.
Oil price tops $100 a barrel
Oil prices jumped above $100 per barrel today, Monday, as the U.S. Navy prepares to take control of ship movements in the Strait of Hormuz.
France Advance to World Cup Quarterfinals, Set Up Morocco Clash
France secured a place in the quarterfinals of the 2026 FIFA World Cup after edging Paraguay 1-0 in their Round of 16 encounter.
User Name: Password:
DG.Miftah inspects water, sanitation projects in Marib
[12/12/2019 06:56]

MARIB - SABA
Deputy Governor of Marib Abd-RabbuMiftah, along with the General Director of the City Mohammad Farhan, inspected Thursday implementing five water and sanitation projects in the city.

Worth USD 1.1 million, the projects are financed by the fund of the Office of Coordinating Humanitarian Affairs in Yemen (OCHA) through Building Foundation for Development.

Miftah inspected the ongoing work in implementing al-Jufaina Water Project targeting up to 5000 displaced families from different provinces. The project, which includes building a 200-cubing meter tank, costs USD 230 thousands.

He inspected also Arroudha Water Project, the first phase, which includes a 200-cubic meter tank and prime network with the length of 45 KM and worth USD 280 thousand and inspected water prime and branch network at al-Salam neighborhood with the length of 13 km covers 550 houses.

Miftahand Farhan also inspected the Emergency Sanitation Project in Marib, which consists of sanitation unit receives 300 cubic meter daily and a sanitation carrier line with the length of 1700 m, in addition to building service facilitations. The project costs USD 450 thousand.

He inspected the ongoing work in implementing the first phase of sanitation project to displaced people's camp near Community College. The project is about to be implemented fully during the forthcoming weeks.

The project costs USD 70,000 and include sanitation unit include 800 cubic meter.

Miftah was detailed by Director of the General Corporation for Water and Sanitation in Marib Hussein bin Jalal and the Head of Building Foundation for Development Dr. Abd-Rabbu Nasser on the projects specifications and levels of accomplishment.


President al-Alimi Praises Korea's Role In Supporting Yemen, Tightening Sanctions On Terrorist Militias
Yemen, Japan Explore Expanded Security Partnership
Prime Minister: Houthis Responsible for Derailing Peace Efforts
Interior Minister, UK Deputy Ambassador Review Security Cooperation
Information Minister: Houthi 'Blockade' Claims Used to Justify Iran Air Bridge
President al-Alimi Applauses Egyptian Active Role In Enhancing Region's Security, Stability
President al-Alimi meets with Presidency of Consultation, Reconciliation Authority
PLC Chairman: IRGC Flight to Sana'a a Flagrant Violation of Yemen's Sovereignty and a Direct Challenge to the International Order
Health Minister Orders Tougher Oversight of Public and Private Health Facilities
Rights Group Documents 752 Enforced Disappearance Cases in Houthi Detention Facilities

About Saba News Agency | Usage Agreement | Contact Us